PROJECT STUDY

Water Cooling & Chiller System Installation, Leamington Spa

This project involved a compact assignment for a client in Leamington Spa, focusing on the installation of a 155kW/255A water cooling and chiller system.
Read more

The specific tasks included:

1. Mounting two 15kW Danfoss inverter drives securely on the wall.

2. Wiring the 3-phase power supply and running communication cables for fault detection and remote on-off functionality from each inverter to the central panel.

No items found.

3. Establishing wiring connections between each 15kW inverter and its respective 15kW pump motor.

4. Installing IP65-rated isolators and pressure transducers on each discharge pump, with wiring linked back to their respective inverters.

5. Organising the wiring from the distribution panel on galvanised steel ladder racking for efficient cable management.

No items found.

Our team efficiently executed these tasks, ensuring the successful implementation of the water cooling/chiller system as per the client's requirements.

No items found.
No items found.
No items found.
No items found.
No items found.

Discover more

Consult with a qualified expert today.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.