This project involved the refurbishment of a pre-existing room, transformed into a laboratory dedicated to sample testing. This commercial installation was executed and completed within a single day.
The fit-out of the laboratory encompassed the installation of essential components, including lighting, power, and data. The lighting comprised of four LED downlights operated by a manual switch. In addition to the lighting components, the fit-out included an arrangement of power and data provisions to accommodate the laboratory's operational needs. A three-part dado trunking system was installed around the perimeter of the laboratory. This trunking housed both data and power.